Powerboard, Installation instructions, Reinstall kick panel – Rough Country 75134-15 User Manual

Page 6: Reinstall fuse install motor, Install lights, Install running boards

Advertising
background image

PowerBoard

®

– Installation Instructions

Rev. N 0713

75134 pg. 6

Reinstall Kick Panel

Secure the wires and reinstall the kick panel and
sill plate. Be careful not to pinch any wires when
replacing the panel.

Reinstall the fuse in the harness.

Reinstall Fuse

Install Motor

Clean the outboard surface
of the of the Linkage below
the bottom mounting bolt.
Peal the adhesive liner off
the back of the Light and
fi rmly press it 1/8" below
the mounting bolt. Plug the
light into the connector with
the black and orange wires
in the wire harness. Repeat
with the other three lights.
Secure lose wires with
Cable Ties.

Install Lights

Motor
Linkage

Motor

Wire
Harness

Light

Linkage

M6-1.0 x 20mm
Socket Head Bolts

Arm

PowerBoard

Install Running Boards

M6-1.0 x 20mm
Socket Head Bolts

M6-1.0 x 20mm
Socket Head Bolts

Mount the Steps to the linkages. Slide the mounting
T-Nut into position. Install M6-1.0 x 20mm Socket
Head Bolts to secure the boards. Use a 5mm Allen
Wrench to tighten the bolts.

Make sure the board moves up and down freely by
hand. If it binds, loosen the linkage to body attach-
ment bolts and adjust the linkage position until the
boards move freely. Do not tighten the bolts at this
time.

Tightening the fasteners before cycling
the step several times may create a

bind, causing a squeaking sound and preventing
the boards from retracting completely and
evenly.

M6-1.0 x 35mm Socket Cap
Screws and M6 Flat Washers

Slide Motor assembly onto drive shaft and mount-
ing bosses of Motor Linkage assembly. Use three
(3) M6-1.0 x 35mm Socket Cap Screws and M6 Flat
Washers to secure Motor. Plug female connector
into Motor. Wrap any exposed wires from the motor
with electrical tape. Torque the screws to 5–7 ft. lbs.
(6.78–9.49 Nm or 60-84 in. lbs.).

Advertising