Tap the drilled hole with a

1

4

npT pipe tap.

check the thread depth as you tap by

periodically removing the tap and screwing the

probe fitting (supplied in pyrometer kit) into the

tapped hole. The probe should thread in 3 to 3

1

2

turns hand tight. Do not install the probe in place

at this time.

remove as many loose chips as possible

from the exhaust manifold. a shop vacuum,

small brush, or fingers will help. now remove the

rag using a welding rod or coat hanger bent into a

hook.

CAUTION! Make sure rags are removed from

exhaust manifold prior to reinstalling turbine

housing!

install the probe in the manifold. anti-seize

on the threads is recommended.

TURBOCHARGER DISASSEMBLY AND REASSEMBLY:

clamp the turbine inlet flange of the

turbocharger in a bench vise. loosen the

four bolts, attaching the turbine housing to the

center bearing section of the turbocharger. (

see

Figure 2

)

remove the bolts, lockplates, and clamp

plates. carefully remove the center bearing

and compressor assembly from the cast iron

turbine housing. if the turbocharger has been in

service for some time, rust and carbon may prevent

the center bearing and compressor assembly from

easily separating from the turbine housing. if light

hammer blows, penetrating oil or heat will not

free the compressor assembly from the turbine

housing, the clamp bolt adjacent to the turbo oil

inlet connection may be backed out so as to push

against the bearing casting and separate the two

components. remove any loose rust or carbon

from the bearing housing that might prevent proper

engagement into the new turbine housing.

install the center bearing and compressor

assembly into the new turbine housing

supplied. apply a dab of anti-seize compound to the

bolts, then install bolts, clamp plates, and lock plates

finger tight to allow for final positioning.

remove the exhaust outlet adapter from

the rear of the turbine housing. clamp the

exhaust inlet flange of the new turbine housing

in a bench vise. using the new gasket provided

install the turbo exhaust outlet adapter casting to

the turbine housing with five 8mm x 20mm metric

hex bolts. apply a dab of anti-seize compound to

the bolts, then torque the bolts to 11.3n-m (100

in-lbs.). Make sure the turbine inlet flange does

not rotate in the vise while torquing.

TURBOCHARGER INSTALLATION

install a new turbo exhaust inlet gasket

provided and apply a dab of anti-seize

compound to the four turbo mounting studs.

install the turbocharger on the exhaust manifold.

Tighten the turbocharger mounting nuts to 32n-m

(24 ft.lbs.) torque.

align the compressor outlet with the

intercooler hose adapter and tighten the

clamp. Tighten the turbine housing clamp plate

bolts to 11.3n-m (100 in-lb.) torque.

spin the turbocharger shaft to make sure it

turns freely. if not, loosen the turbine clamp

plate bolts and check for misalignment between the

turbine housing and turbocharger center section.

retighten bolts and check again.

use the new gasket provided to connect the

turbocharger oil drain tube to the turbocharger.

Make sure the turbocharger oil drain flange is clean

and free of any old gasket material. Tighten the drain

flange bolts to 24n-m (18 ft.lbs.) torque. nOTe: if the

bolts encounter excessive resistance prior to seating

against the flange, check for paint build up in the

threads of the turbo bearing housing. The threads

may need to be chased with an 8mm x 1.25 metric

tap.

reconnect and tighten the turbo oil supply

hose.

16.

17.

18.

19.

20.

21.

22.

15.

11.

12.

13.

14.