Banks high-ram™ installation – Banks Power Dodge Trucks: (Diesel ’03 - 07 5.9L Cummins) Intake- High-Ram Air Intake '03-07 User Manual

Page 6

Advertising
background image

6

96768 v.8.0

7.

Being careful not to scratch or

gouge the mating surfaces of the

parts, completely remove the stock

gaskets from both sides of the heater

element block and intake manifold,

using a gasket scraper as needed.

clean and dry all sealing surfaces

thoroughly.

8.

Reinstall the electric heater

element block onto the intake

manifold, placing one of the supplied

gaskets between it and the intake

manifold. Reattach the three electrical

connections to the heater element.

BANKS HIGH-RAM™

INSTALLATION

CAuTION: The Banks studs have

different threads on each end.

9.

Make sure that the M8 ends go into

the engine intake manifold. The two

shorter studs go on the inboard side

(closest to the valve cover). Apply the

supplied thread lock compound at the

M8 ends and hand-tighten the studs

into the intake manifold.

10.

Using the two

5

16

”-24 nuts

supplied, tighten the studs into the

intake by threading both nuts onto

the stud, then tighten the nuts against

each other with two

1

2

” open end

wrenches. Tighten and torque the

stud to 3-5 ft-lbs by turning the top

nut. Remove the nuts from the stud

by using two open end wrenches to

loosen the nuts in relation to each

other. Repeat the process for each

stud. The process is shown in

Figure 2.

1

/

2

INTAKE HEATER

M6 NUT & M6

WASHERS (2)

M8 X 1.25 BOLT

SAE WASHER

LARGER

DIAMETER

TERMINAL

GROUND STRAP

FACTORY NUTS

Figure 2

Advertising