Banks Power Ford Trucks: (Diesel ’99 - 03 7.3L Power Stroke) Power Systems- PowerPack, Stinger-Plus, Stinger & Git-Kit '19991_2-2003 F-250 & F-350 Trucks and Excursions User Manual

Page 15

Advertising
background image

96336 v.10.0

15

side of the clamp. Reinstall the bracket

using a #56 hose clamp provided to secure

the filter/dryer unit to the bracket.
NOTE: Before slipping any boost tubes

and the corresponding hoses, into

position, ensure that all connection ends

are clean and free of any oil residue and

contaminates. Clean compressor outlet

and all connection points with a non-oil

based solvent such as Acetone, Mineral

Spirits, Denatured Alcohol or Lacquer

Thinner. Read and follow the manufactures

operation instruction

15.

Slide three #52 hose clamps over the

left boost tube. These will be used later to

secure the heatshield in place. Set both

boost tubes into place in the vehicle. Place

two of the 3” silicone hump hoses onto

the intercooler inlet and outlet, and fasten

with the T-bolt clamps provided. Position

two more clamps on the open ends of the

silicone hoses, and place the intercooler

into the vehicle slipping the boost tubes

into the hoses on the intercooler and the

intercooler into the rubber saddles on the

lower mounting brackets. Do not tighten

these clamps yet.

16.

Place the air conditioning condenser

back into its original position. Reinstall

upper crossbar into truck, using the

original bolts. Reinstall the diagonal braces

to the radiator support and reattach the

power steering cooler to the right side

diagonal.
NOTE: Rotate the upper power-steering

fluid tube in the clip to allow the hose

portion to clear the bottom of the right

lower intercooler bracket.

17.

Remove the factory rubber isolators

from the factory intercooler and install

them into the upper brackets of the

Banks intercooler. Install the original

studs through the isolators into the upper

crossbar and tighten them. Tighten the

upper mounting-bracket bolts on the

intercooler.
For late 1999

1

2

–2003 models,

proceed to

Step 23

.

18.

Remove the sensors from the factory

compressor discharge plenum casting

and install them into the Banks TwinRam

intake assembly.
Early 1999

1

2

models: Remove the

heating element from the factory

compressor discharge plenum casting

and install it in the Banks TwinRam intake

assembly.

19.

Slide the two 2” silicone hoses up the

legs of the TwinRam. Slip two #36 hose

clamps over each hose and install the

TwinRam to the engine, sliding the hoses

down the legs and onto the intake stubs,

making sure that the hoses are positioned

equally between the TwinRam legs and

the manifold stubs. Tighten the clamps.

Attach the bracket to the rocker cover

using the 8mm x 30mm metric bolts and

spacers provided.

20.

Attach the wastegate control

solenoid to the tab on the TwinRam with

the supplied

1

4

-20 x 1

1

4

” hex bolt and

washer. Reconnect the wiring harnesses

to the sensors.

21.

Attach the right side boost tube to

the TwinRam using a 3” silicone hump

hose, and two T-bolt clamps.

22.

Place the new O-ring into the recess

in the compressor housing and attach

the compressor discharge elbow to the

compressor housing with the new V-band

clamp provided. A small amount of bearing

grease may be used to hold the O-ring in

position while installing the elbow. Bolt

the compressor discharge elbow to the

TwinRam through the tab provided for this

purpose using the

5

16

” bolt, washers, and

nylock nut provided. Install a

1

8

” NPT x

1

8

compression fitting (supplied in the boost

gauge kit) in the bung on the compressor

discharge elbow. Sparingly apply pipe

sealant tape or paste on the male pipe

threads, and tighten the hex on the fitting

body (NOT the compression nut). Proceed

to

Step 24

.

23.

Late 19991⁄2–2003 models (All

models for Stinger-Plus installation):

Place the O-ring into the recess in the

turbo compressor outlet and reinstall the

factory compressor discharge plenum

casting on the turbocharger. A small

amount of bearing grease may be used to

hold the O-ring in position while installing

the casting. Slide the hump hoses on the

boost tubes onto the compressor plenum

discharge casting. Reconnect any wiring

or sensor tubes to components on the

compressor discharge casting. Reconnect

boost line to wastegate actuator.
If a Banks Brake is being installed,

proceed to

Step 25

.

24.

To reconnect the exhaust

backpressure control valve, hold the cover

on the end of the rod back and have

someone start the engine. When the rod

extends after a few seconds, push it up

onto the valve linkage and allow the cover

to snap back into position.
wARNING! Stay clear of moving

parts such as engine cooling fan and

belts. Do not drive the vehicle until

the remainder of the installation is

complete.

25.

While engine is running, check for oil

leaks around the base of the turbocharger

center section or the pedestal mount.

Repair any leaks before continuing.
NOTE: The most likely cause of an oil leak

in this installation is a pinched O-ring at

the base of the turbocharger.
For Stinger-Plus installation proceed to

Step 32

.

26.

Make sure that the boost tubes clear

all moving parts, and that the hoses do not

chafe on any sharp edges. Tighten all of

the boost tube clamps.

27.

Reposition the left and right air

deflectors back into their original positions,

and use the pushpins to attach them to

the radiator support. Reattach the wiring

harness removed from the intercooler

mounting studs. Reinstall the original

radiator mount brackets onto the radiator

upper support. Tighten the bolts. Reattach

the radiator overflow tank to the upper

radiator bracket. Reinstall the jacking tools

to the core support. Reinstall the grille

support to the vehicle using the original

hardware. Reinstall the air conditioning

condenser upper brackets. Reattach

the right and left air deflectors to the

grille support with the original hardware.

Reinstall the hood latch in its original

position.

28.

Reinstall the light bulbs into the

turn signal/marker light combinations,

and reinstall the combinations into the

vehicle. Press them firmly, straight back

into the attaching clips and bolt them into

place. Reinstall the headlight bulbs into

the headlight assemblies. Be careful not

to touch the headlight bulbs themselves

with your fingers, as oil from your skin can

cause damage to the bulbs. If necessary,

clean the bulbs thoroughly with rubbing

alcohol before reinstalling them.

29.

Turn on the headlights and turn

signals briefly to check for proper

operation.

30.

Reattach the upper radiator air

deflector to the grille support and upper

radiator support with the plastic pushpins

previously removed. Reinstall the grille by

pushing it into the lower clips. Reinstall the

original screws.

31.

Recheck all clamps to ensure that

they are tight before driving the vehicle.

32.

Clean an area that is easily visible

on the upper radiator core support with

a non-oil based solvent, such as Acetone,

Mineral Spirits, Denatured Alcohol or

Lacquer Thinner. Allow to dry and then

attach the Banks E.O. sticker to the upper

radiator core support.

–END, SECTION 7–

Advertising