Banks Power GM Motorhomes: (Gas ’01 - 10 8.1L Workhorse) PowerPack & Stinger systems '05 & Later Class-A MH, W-24 chassis User Manual

Page 11

Advertising
background image

completely at this time incase more

adjustment is required.

31.

Level the tailpipe extension

with the motorhome and place the

4-inch universal hanger strap onto

the extension pipe. Insert one of the

hanger strap holes into the Banks

tailpipe hanger bracket stud. Using

the

3

8

” SAE washer and crimplock nut

provided secure the hanger strap to

the frame mounted hanger. Slide the

4-inch hanger clamp on the extension

pipe until the hanger strap is square to

the extension pipe. Lightly tighten the

clamp (See Figure 8).

32.

Check the extension pipe to

ensure it is level and the gap between

it and the body is correct. If not

loosen the connections and adjust

accordingly. Once pipe is level and at

the correct height tighten all clamps.

Install a 3

1

2

” clamp on the outlet of

the muffler. Make sure the tailpipe is

inserted fully into the slip joint of the

muffler and tighten the clamp.

33.

Wrap the factory rubber fuel line

above the muffler with the supplied

heat wrap and retain with steel cable

ties

34.

Slide the tailpipe tip onto the

tailpipe extension. Position the tip so it

extends 1-inch beyond the coach body

or wherever aesthetically pleasing and

tighten the band-clamp.

BANKS

TAILPIPE TIP

4“ CLAMP

TAILPIPE

EXTENSION

4“ CLAMP

HEATSHIELD

ROTATION

UPPER

TAILPIPE

(TRIMMED)

31/2”

CLAMP

BANKS

MUFFLER

HEAT

WRAP

FUEL LINE

FACTORY

RUBBER

HANGER

BANKS

MUFFLER BRACKET

(W/PIN)

M12 HARDWARE

BANKS

TAILPIPE HANGER

BRACKET (W/STUD)

UNIVERSAL

HANGER

STRAP

Figure 8 (Driver-side shown)

96438 v.2.0

11

Advertising