Banks Power Chevy_GMC Trucks: Duramax LLY-LBZ (Diesel ’06 - 07 6.6L) Speed Control- SpeedBrake '06-07 (iQ) For use with Banks iQ User Manual

Page 16

Advertising
background image

16

97239 v.4.0

4.

Find a suitable place on the

windshield for ease of access and

viewing of Banks iQ. Use location

shown in figure 15 as a reference

for mounting Banks iQ in your

vehicle. Loosen the knob and move

the swivel suction plate to achieve

desired viewing angle of the Banks

iQ screen. Do a test fit and note the

angle necessary to achieve the correct

viewing angle.

5.

Make sure the suction cup and the

mounting area on the windshield are

clean and dry. With the suction lever

in the up position, ensure the suction

cup is flat against the windshield, and

then push the suction lever down to

secure in place.

6.

Next, remove and set the fuse

access panel aside. See figure 16.

7.

Locate the Banks OBD II Interface

Cable in your kit. This cable has

three connection points. Connect the

RED OBD II connector on the Banks

interface cable to the vehicle OBD II

connector. Use a cable tie as shown

in figure 17 to secure the Banks

interface cable to the vehicle OBD II

connector.

8.

Next, connect the 6-terminal

connector on the Banks OBD II

Interface Cable to the 6-pin connector

on the Banks SpeedBrake wire

harness.
Note: If your vehicle is equipped

with a Banks Diesel tuner, optional

tuner-to-SpeedBrake cable will be

needed (P/N 55411). See Figure

18. Disconnect the 6-pin terminal

connections between Banks oBD

II Interface Cable and Banks Diesel

tuner. Connect the oBD II 6-pin male

connector to the optional tuner-to-

SpeedBrake 6-pin female connector.

Connect the three (3) wire 6-pin male

connector to the Diesel tuner female

6-pin connector and connect the five

(5) wire 6-pin male connector to the

SpeedBrake female 6-pin connector.

Figure 15 Mounting location for Banks iQ, Chevy LMM Shown.

Advertising