Banks Power Jeep Trucks: (Gas ’91 - 02 2.5L) Exhaust- TorqueTube system '91-02 2.5L Wrangler User Manual
Page 4
4
96437 v.3.0
7.
Remove the hardware from
headpipe and disconnect the head
pipe from the exhaust manifold (see
Figure 2).
8.
If necessary, remove the factory head
pipe by removing the 0
2
sensor from the
head-pipe. Remove the clamp holding
the headpipe and catalytic converter.
Remove headpipe hanger pin from the
rubber hanger. Remove the factory
headpipe from the exhaust system (an
oxy-acetylene torch may assist in
heating the headpipe for removal).
9.
Loosen intake/exhaust bolt/nuts 1,6
and 7, but do NOT remove (see
Figure 2). These bolt/nuts act as
supports for the exhaust manifold.
Remove all remaining intake / exhaust
manifold bolts and set aside hardware
for re-assembly (a
9
⁄
16
" swivel socket
may save time).
10.
Remove the intake manifold from
the engine block. Remove the
remaining bolt/nuts (bolts 1,6 and 7)
and remove the exhaust manifold.
Note: If possible, do not remove the
studs from the block (6 and 7).
Figure 2