Figure 3 figure 4 – Banks Power Ford Motorhomes: (Gas ’93 - 98 7.5L Class-A) PowerPack System (Class-A, JD_OK chassis) For Use w_ 460 EFI Engine User Manual
Page 7
install the banks y-pipe assembly to the
torquetube manifolds using four
3
⁄
8
- 16 x 2”
hex bolts, four
3
⁄
8
uss washers and a 2
1
⁄
2
” u-clamp.
use two donut gaskets, provided, between the
manifold outlets and y-pipe flanges. See Figure
1
.
to prevent the transmission shift rod from
rattling against the TorqueTubes, bend the
shift rod bell crank lever as required to provide
clearance between the tubes and the rod. run
the shift lever in the vehicle through all gear
positions, and check that the shift rod clears the
TorqueTubes. If possible, try to maintain
1
⁄
4
inch or
more clearance to prevent contact during engine
rock-over. See Figure
5.
cut the longer air injection tube to provide
clearance to the exhaust manifold. cut
the tube 6 inches from the most forward bend,
as shown in Figure
3.
then cut one inch off of
21.
20.
19.
7
p.n. 96347
fIgure 3
figure 4
attach air injection tubing to tabs on right
hand exhausT ManIfOld and y-pIpe aT
lOcaTIOns shOWn WITh One 5/16–18 x 1” hex
bOlT,
TWO 11/16 O.d. x 5/16 I.d. Washers, and One
5/16–18
crIMp lOcknuT aT each lOcaTIOn.