Banks Power Dodge Trucks: (Diesel ’03 - 07 5.9L Cummins) Intake- Big Hoss Intake Manifold System '03-07 235, 250, 305 and 325 HP, Dodge Cummins 5.9L (24-valve) Trucks User Manual

Page 10

Advertising
background image

10

96774 v.5.0

1.

if not previously installed, tap

the three (3)

3

16

x

3

8

dowel pins

into holes on the cylinder head

intake flange face. Dowel pins

must not protrude more than

.200 inch from the milled surface

of the head.

2.

Install the o-ring into the

groove on the intake manifold.

Remove any excess grease

from the o-ring that may be left

from the port-matching imprint

procedure. Take care that the

o-ring does not get stretched or

twisted during installation.

3.

install manifold, bolts and

washers as shown in Figure 4.

Place a

5

16

AN washer on each

of the

5

16

-18 x 1” upper manifold

bolts. Apply Teflon sealant to

the first 5-6 threads of each bolt

and install manifold with o-ring

against cylinder head, lightly snug

all bolts.

4.

Place a

3

8

-inch conical

(Belleville) washer on each of the

six

3

8

inch lower manifold bolts.

(Dished side faces away from

bolt head). Apply a drop of oil on

the o-ring of each

3

8

Stat-O-Seal

washer and slide washers against

the conical washers on the lower

manifold bolts.

5.

Working from the center

outward, install the lower

manifold bolts and torque the

inner bolts to 20 ft. lbs. Torque

the two outer bolts on the longer

side and the outer bolt on the

short side to 30-35 ft. lbs. Torque

upper manifold bolts to 16-18ft.

lbs. See Figure 4.

6.

install fuel rail with three M8 x

40 mm hex bolts. Lightly snug the

bolts.

7.

Install high-pressure injector

nozzle lines and clamp brackets.

Apply Teflon sealant to the first

5-6 threads of the four factory

clamp bracket bolts, install bolts

but leave bolts loose. Tighten

nozzle lines at head and fuel rail,

then tighten bracket bolts and

fuel rail bolts. Torque bolts to

12-14 ft. lbs..

8.

Lightly oil o-ring on factory

MAP/TEMP sensor and install

in bore on top of manifold.

Apply a very small amount of

Teflon sealant to the two factory

mounting screws and tighten.

9.

Install two socket head

1

8

NPT pipe plugs in ports on intake

manifold. Both ports are located

near the front of the manifold,

one on the top and one on the

side. A mechanical boost gauge

or other boost-sensing device

may be connected to either port.

Use Teflon sealant on the pipe

threads.

10.

Reconnect electrical wire

looms to injector plugs and

engine sensors. Reroute engine

wire looms if necessary. Unused

intake heater wiring should be

removed. An M6 x 12mm hex

bolt and M6 lock washer is

provided to anchor the factory

wire loom clamp to the front

flange of the intake manifold next

to the head. An additional M6 x

35mm hex bolt, M6 lock washer,

and 1” x

1

4

I.D. spacer are

provided to anchor the factory

wire loom clamp to the bottom

of the intake manifold behind the

fuel filter.

11.

Mount the fuel filter

assembly bracket to the side of

the manifold using the factory

bolts and reconnect the low

pressure fuel lines. Reinstall the

high-pressure fuel line from the

fuel injection pump to the fuel rail

and tighten.

12.

On vehicles where the

throttle controller was originally

bolted to the cylinder head,

proceed to step 13. On all other

installations, install the coarse

threaded end of a

1

4

X 1

1

4

stud

in the front “ear” on the 4-inch

diameter inlet hose joint of

the Big Hoss intake manifold.

Temporally use two

1

4

-28 hex jam

nuts tightened against each other

on the fine threads to tighten the

stud. once tight, remove the nuts

and proceed to step 17.

13.

Reinstall the throttle

controller assembly on the three

bosses at the top/front of the

intake manifold using the factory

bolts. From inside the cab, check

that the throttle pedal moves

smoothly through its full travel.

14

. Install an M6 spring clip

nut on the upper rear throttle

controller cover tab (see Figure

5). Reinstall plastic throttle

controller cover using all but one

Section 7

INTAke MANIFoLD To CyLINDer HeAD ASSeMBLy

Figure 5

Advertising