Banks Power Dodge Trucks: (Diesel ’03 - 07 5.9L Cummins) Intake- Big Hoss Intake Manifold System '03-07 235, 250, 305 and 325 HP, Dodge Cummins 5.9L (24-valve) Trucks User Manual

Page 8

Advertising
background image

8

96774 v.5.0

The layout for the drilled and

tapped holes on the machined

intake face is referenced from

the centerline of the front head

bolt and the head gasket surface

of the head. Figure 3 shows the

locations of the upper and lower

bolt hole rows, as well as the

three (3) dowel pin holes.
IMPorTANT: Note that all hole

centerlines are SQUARE TO THE

HEAD GASKET SURFAcE of the

head. Not the angled surface that

was milled. It may be desirable to

mill a

1

4

inch diameter flat spot at

each hole location to prevent the

tapdrill from walking off center.

All but one of the upper row of

twelve

5

16

-18 tapped holes are

drilled and tapped through the

outer wall of the rocker cover

rail. The lower row of six

3

8

-16

tapped holes must not exceed

the indicated tap drill depth to

prevent the holes from breaking

through into the water jackets.

Before drilling, verify that your

head has enough material to

accommodate the indicated tap

drill depth. These holes must be

bottom-tapped to provide the

proper bolt thread engagement.
The dowel pin holes may be

drilled or drilled undersize and

then reamed (this is the preferred

method). The dowel pins provide

alignment and allow the manifold

to expand with temperature

change while maintaining proper

top-to-bottom position.

-EnD, SEcTion 5-

No further machining operations

are required for manifold

installation however the milled

intake surface opening on

the head should be ground to

match the manifold opening

for optimum airflow. The milled

surface on the head should be

sprayed with layout dye and the

three (3) dowel pins supplied

tapped into place. Dowel pins

should protrude no further than

.200 above the milled surface.
Install the 0-ring in the grove on

the intake manifold flange face.

Take care that the 0-ring does

not get stretched or twisted.

coat the exposed surface of the

o-ring with enough white grease

so it will leave an imprint of

its position when bolted to the

cylinder head. Temporarily bolt

the manifold to the cylinder head

with 8-10 bolts (See Figure 4 for

bolt locations), washers must be

in place on long bolts to draw

bolts against manifold.
Using a sharp scribe, reach

through the 4-inch diameter

hose inlet and scribe a line on

the head at the head-to-manifold

junction at all places where the

milled head surface hangs into

the manifold opening. A piece

of stiff welding rod ground to a

sharp point or a hook scribe may

be used to reach farther into

the manifold. Once the head has

been marked as far as possible

through the manifold opening,

remove the manifold from the

head and observe the o-ring

imprint on the head surface to

determine where you can safely

grind head material away near

the 0-ring grove.
We suggest you keep your

grinding no closer than .050

to the inner edge of the O-ring

grove. Pay particular attention to

the o-ring sealing at the upper

rear corner of the cylinder head

intake opening where the o-ring

has a very narrow sealing path.

The sharp tang which is left on

the outside of the head at the

rear may be cut off flush with the

rear of the intake manifold flange.

If additional cylinder head porting

and valve work is to be done, it

should be completed at this time.

once all headwork is completed,

the head may be cleaned,

reassembled, and reinstalled

on the engine per the service

manual reassembly procedure.
Note: Some cylinder head

gaskets have tabs, which extend

out from the head-to-block

junction on the intake side of

the engine. these tabs should

be bent down after the head is

installed to clear the bottom of

the intake manifold.
The three throttle control bosses

on the top/front of the intake

manifold may be cut off if

removal is required for a second

injection pump as part of a dual

pump kit. This modification

should be done prior to intake

manifold installation

-EnD, SEcTion 6-

Section 6

PorT MATCHING

Section 5

DrILLING AND TAPPING

Advertising