Banks Power Ford Trucks: (Diesel ’99 - 03 7.3L Power Stroke) Power Systems- Git-Kit, Stinger, Stinger-Plus & PowerPack '99-03 F-450 & F-550 pickup (For 3-1_2" exhaust only) User Manual

Page 13

Advertising
background image

96328 v.11.0

13

14.

On the passenger side of the

engine compartment, locate the air

conditioning filter/dryer assembly. It will

be necessary to modify the clamping

bracket to allow clearance for the new

tube assembly. Remove the upper filter

dryer bracket by unbolting in three

places. Using a hacksaw or other cutting

tool cut the forward half of the clamp off

in front of the elevated tab across from

the opening of the clamp. Next cut the

remaining tab off of the open side of the

clamp. Reinstall the bracket using a #56

hose clamp provided to secure the filter/

dryer unit to the bracket.

15.

Slide three #52 hose clamps over

the left boost tube. These will be used

later to secure the heatshield in place.

Set both boost tubes into place in the

vehicle. Place two of the 3” silicone

hump hoses onto the intercooler inlet

and outlet, and fasten with the T-bolt

clamps provided. Position two more

clamps on the open ends of the silicone

hoses, and place the intercooler into

the vehicle slipping the boost tubes into

the hoses on the intercooler and the

intercooler into the rubber saddles on

the lower mounting brackets. Do not

tighten these clamps yet.

16.

Place the air conditioning

condenser back into its original position.

Reinstall upper crossbar into truck, using

the original bolts. Reinstall the diagonal

braces to the radiator support and

reattach the power steering cooler to

the right side diagonal.
NOTE: Rotate the upper power steering

fluid tube in the clip to allow the hose

portion to clear the bottom of the right

lower intercooler bracket.

17.

Remove the factory rubber

isolators from the factory intercooler

and install them into the upper brackets

of the Banks intercooler. Install the

original studs through the isolators into

the upper crossbar and tighten them.

Tighten the upper mounting bracket

bolts on the intercooler.
For Late 1999

1

2

–2001 models

proceed to

Step

23

.

18.

Remove the sensors from the

factory compressor discharge plenum

casting and install them into the Banks

TwinRam intake assembly.
Remove the heating element from the

factory compressor discharge plenum

casting and install it in the Banks Twin

Ram intake assembly.

19.

Slide the two 2” silicone hoses up

the legs of the TwinRam. Slip two #36

hose clamps over each hose and install

the TwinRam to the engine, sliding

the hoses down the legs and onto the

intake stubs, making sure that the

hoses are positioned equally between

the TwinRam legs and the manifold

stubs. Tighten the clamps. Attach the

bracket to the rocker cover using the

8mm x 30mm metric bolts and spacers

provided.

20.

Attach the wastegate control

solenoid to the tab on the TwinRam with

the supplied

1

4

-20 x 1

1

14

” hex bolt and

washer. Reconnect the wiring harnesses

to the sensors.

21.

Attach the right side boost tube to

the TwinRam using a 3” silicone hump

hose, and two T-bolt clamps.

22.

Place the new O-ring into the

recess in the compressor housing and

attach the compressor discharge elbow

to the compressor housing with the new

v-band clamp provided. A small amount

of bearing grease may be used to hold

the o-ring in position while installing the

elbow. Bolt the compressor discharge

elbow to the TwinRam through the

tab provided for this purpose using

the

5

16

” bolt, washers, and nylock nut

provided. Install a

1

8

-inch NPT x

1

8

-inch

compression fitting (supplied in the

boost gauge kit) in the bung on the

compressor discharge elbow. Sparingly

apply pipe sealant tape or paste on

the male pipe threads, and tighten

the hex on the fitting body (NOT the

compression nut).

23.

Place the O-ring into the recess

in the turbo compressor outlet and

reinstall the factory compressor

discharge plenum casting on the

turbocharger. A small amount of bearing

grease may be used to hold the O-ring

in position while installing the casting.

Slide the hump hoses on the boost

tubes onto the compressor plenum

discharge casting. Reconnect any

wiring or sensor tubes to components

on the compressor discharge casting.

Reconnect boost line to wastegate

actuator.

24.

To reconnect the exhaust

backpressure control valve, hold the

cover on the end of the rod back and

have someone start the engine. When

the rod extends after a few seconds,

push it up onto the valve linkage and

allow the cover to snap back into

position.

25.

Make sure that the ignition is off,

then disconnect all three connectors

from the PCM for easier accessibility to

the wires.

26.

While engine is running, check

for oil leaks around the base of the

turbocharger center section or the

pedestal mount. Repair any leaks before

continuing.
NOTE: The most likely cause of an oil

leak in this installation is a pinched

O-ring at the base of the turbocharger.
For Stinger-Plus installation

proceed to

Section 8

.

27.

Reposition the left and right air

deflectors back into their original

positions, and use the pushpins to

attach them to the radiator support.

Reattach the wiring harness removed

from the intercooler mounting studs.

Reinstall the original radiator mount

brackets onto the radiator upper

support. Tighten the bolts. Reattach

the radiator overflow tank to the upper

radiator bracket. Reinstall the jacking

tools to the core support. Reinstall the

grille support to the vehicle using the

original hardware. Reinstall the air

conditioning condenser upper brackets.

Reattach the right and left air deflectors

to the grille support with the original

hardware. Reinstall the hood latch in its

original position.

28.

Reinstall the light bulbs into the

turn signal/marker light combinations,

and reinstall the combinations into

the vehicle. Press them firmly, straight

back into the attaching clips and bolt

them into place. Reinstall the headlight

bulbs into the headlight assemblies.

Be careful not to touch the headlight

bulbs themselves with your fingers, as

oil from your skin can cause damage to

the bulbs. If necessary, clean the bulbs

thoroughly with rubbing alcohol before

reinstalling them.

29.

Turn on the headlights and turn

signals briefly to check for proper

operation.

30.

Reattach the upper radiator air

deflector to the grille support and

upper radiator support with the plastic

pushpins previously removed. Reinstall

the grille by pushing it into the lower

clips. Reinstall the original screws.

31.

Recheck all clamps to ensure that

they are tight before driving the vehicle.

–END, SECTION 7–

Advertising