1.

For 1999.5-2003 model year:

Remove the five bolts around the

outside of the compressor cover and

carefully remove the cover by pulling it

straight off the turbocharger assembly,

avoiding contact with the compressor

wheel. Use caution to avoid damaging

the sealing o-ring around the outside

diameter of the compressor back plate.

2.

Secure the turbine wheel in a vise by

clamping the hub of the turbine wheel.

Remove the compressor wheel using a

5

8

” socket. Install the new compressor

wheel provided in the kit. Slide the

wheel onto the shaft and lightly turn

the wheel to engage the threads. If

the wheel does not easily engage the

threads, back the wheel off and try

again. It may be helpful to listen for

a small click while rotating the wheel

counterclockwise, and then rotate the

wheel clockwise again. Once the wheel

has engaged the threads properly,

spin it on by hand until snug. Using a

torque wrench, tighten the assembly

to 100 in/lbs. Reinstall the compressor

cover, making sure that the o-ring is

properly seated against the backplate

of the turbo. Reinstall the five bolts and

tighten.

3.

Place Banks Quick-Turbo

®

turbine

housing onto the center section, again

paying careful attention to the turbine

blades. Apply some anti-seize to the

four bolts and reinstall them. Check the

orientation of the assembly, then tighten

the bolts.

4.

Install the Banks Big Head actuator

onto the turbocharger. Tighten the lock

nuts on the mounting studs and adjust

the rod end until the hole aligns with

the wastegate arm pin. Turn the rod

end link clockwise an additional six full

turns, such that it will add preload to

the wastegate. Apply a regulated supply

of air pressure to the nipple on the

actuator until the rod extends enough to

slip over the wastegate arm pin. Install

the e-clip onto the wastegate arm pin to

retain the actuator rod. Tighten the jam

nut down on the end link.

For Stinger installation proceed to

Section 6

.

5.

Reinstall the turbocharger onto

the pedestal assembly on the engine.

Make sure the sealing area on the

pedestal assembly and the bottom of

the turbocharger are clean, and the

new O-rings provided are in place, then

bolt the turbocharger to the pedestal.

Reinstall the V-band clamp attaching

the turbine housing to the exhaust inlet

casting.

6.

Reinstall the air inlet hose to the

turbocharger compressor air inlet.

–END, SECTION 5–

Section 5

QuICK-TuRBo

®

AND CoMPRESSoR wHEEL INSTALLATIoN

1.

Loosely clamp the upper portion of

the turbine outlet pipe to the exhaust

backpressure control valve on the

turbocharger. Slide two 3

1

2

-inch exhaust

clamps over the lower portion of the

turbine outlet pipe and install the pipe,

aligning the hanger pin in the rubber

hanger. Reinstall the catalytic converter

or intermediate pipe by slipping the inlet

into the lower portion of the turbine

outlet pipe (see

Figure 4

).

NOTE: On some Powerstrokes a ground

strap is bolted on back of the cylinder

head. This bolt may interfere with the

Banks turbine outlet pipe. If so, remove

the bolt and relocate it in the cylinder

head.

2.

Slide a 3

1

2

-inch exhaust clamp over

the inlet of the muffler. Reinstall the

extension pipe, if removed, and install

the Banks Dynaflow

®

muffler onto the

end of the intermediate pipe, aligning

the slot with the raised tab. Insert the

hanger pins into the rubber hangers at

the front and back of the muffler.

3.

Slide a 3

1

2

-inch exhaust clamp over

the outlet of the muffler. Install the

Banks Monster

®

tailpipe over the rear

axle and into the outlet of the Banks

Dynaflow muffler. Insert the hanger pin

into the rear rubber hanger.

4.

Position all the exhaust components

such that all the hanger pins are parallel

with the ground and all exhaust tubing

is located properly. Lightly tighten the

clamps to maintain position. The tailpipe

tip should be positioned 2 to 2

1

2

inch

below the bottom edge of the fender.

All hangers should be level and hanging

slightly forward (see

Figure 5

).

5.

With everything positioned properly,

begin tightening all exhaust clamps,

beginning with the V-band clamp at the

turbine discharge, and working down

stream.