Newport Brass 2566 Skylar User Manual
Page 3

Trim Installation
1.Utilizing 3/4” copper pipe, make connections between spout, valves and water supply.
See Figure 3. Warning: To prevent severe damage to valve body, any solder/braze
process must be performed a min. of 4" from ports.
2.Place the O-RING (9) and ESCUTCHEON (11) onto STEM (12). Secure HANDLE (8) into
place by first engaging the STEM (12) and then threading MOUNTING NUT (7) onto car-
tridge. Any adjustments for rotational alignment must be made to the valve body, not to
the cartridge. Repeat on other side. See Figure 4. (Cartridge Bonnet factory torque is 14-
16 ft-lbs.)
3.Turn on water supply, and flush both valves until water is clear.
4.Check for leaks and make any final adjustments required.
Figure 3
Inlet for
hot
water
supply
Inlet for
cold water
supply
Figure 4
8
11
12
9
NWP-1-656
EN-2108
REV -