Newport Brass 9203 Astor User Manual

Page 2

Advertising
background image

NWP-9203

Recommended Installation by a Professional Plumbing Contractor

Note: The use of petroleum base plumbers putty on our products will nullify the war-

ranty. We recommend the use of clear silicone sealing materials. Recommended
deck thru hole Ø 1.38"

1. Place the spout hoses, one at a time, and mounting rod through mounting surface.

Secure spout into place with mounting bracket and nut. See Fig. 1

2. Attach hot/cold spout supply hoses to appropriate supply lines and valves in the

wall. Spout supply hose ends ½" NPT. See Fig. 2

3. Remove drain PLUG (17) from FLANGE (18). Place FLANGE (18) and white WASH-

ER (19) through sink drain opening. (Clear silicone may be used in place of white
washer.) From bottom side of sink, place cone shaped rubber WASHER (20) onto
FLANGE (18) and slide up against sink bottom. Note: Cone portion of WASHER (20)
to face upward. Next slide on clear flat WASHER (21) and secure with flange NUT
(22). Place clear WASHER (23) into drain BODY (24) & tighten to FLANGE (18).
Apply thread sealant to TAILPIECE (25) and attach to drain BODY (24). Attach TAIL-
PIECE (25) to p-trap drain (not included). See Figure 3.

4. Place drain PLUG (17) into FLANGE (18). Insert pop-up ROD (26) through spout and

secure to STRAP (27), approximately 1" from end of ROD (26), with SCREW (28).
Insert ball ROD (29) into the drain's rod opening, secure with ball rod NUT (30).
Adjust the rise of the plunger and CLIP (31) into place. Adjust ball ROD (29) and pop-
up ROD (26) so drain will open and close properly. See Figure 4.

5. Remove aerator from spout using blue key supplied. Turn on water supply, and flush

system until water is clear. Check for leaks and make any final adjustments required.
Re-attach aerator to the spout.

Advertising