Step 4 – Check Operation

1.

To check the RESET operation, rotate the

mechanism handle counterclockwise toward

the RESET position until the breaker resets.

2.

To check the ON–OFF operation of the

breaker, depress the interlock release and

rotate the handle between the ON and OFF

positions.


3.

With the rotary handle and the circuit breaker

in the ON position, press the trip button to

verify that the rotary handle indicates TRIP.

Figure 8 handle operator installed on
vertically mounted breaker

Figure 9. Swing of the handle extension

180

0


Figure 10. Handle operator installed on

horizontally mounted breaker

FENRD



These instructions do not cover all details or variations in equipment nor do they provide for every possible contingency

that may be met in connection with installation, operation, or maintenance. Should further information be desired or

should particular problems arise that are not covered sufficiently for the purchaser’s purposes, the matter should be referred

to the GE Company. The circuit breaker is a sealed unit that contains no user-serviceable parts. Tampering with the seal will

void the warranty.

g

GE Consumer & Industrial

General Electric Company

41 Woodford Ave., Plainville, CT 06062

www.geindustrial.com

DEH41028

DEH41028 03 R0625431

© 2004 General Electric Company

Advertising