GE Industrial Solutions Spectra Series Power Panelboards 800 & 1200 Ampere Fusible Switch User Manual

Page 2

Advertising
background image

Figure 2. Hook tabs on the switch bottom aligned on the support rail.

Figure 3. Mounting the switch in position on the interior.

Figure 4. Securing the module straps.

3. Attach the switch to the module.

Orient the switch

with the

ON

end of the label facing up. Attach the

strap module assembly with the ten #10-32 hex-head
self-tapping screws provided, as shown in Figure 5.
Tighten the screws to 27–32 in-lb.
Secure the load end (line end for branch
installation) of each switch unit to the straps in the
module assembly with the

5

/

16 x 7

/

8

" hex-head bolts,

conical washers, and flat washers provided, as shown
in Figure 6. Tighten the bolts to 90–110 in-lb.

Figure 5. Attaching the strap module to the switch.

Figure 6. Attaching the switch to the straps.

4. Attach the Main label.

For a main device only, attach

the MAIN label from the panelboard label kit to the
panelboard cover where it will be clearly visible.

CAUTION:

Insert filler plates over all unused

spaces before energizing the power panel.

These instructions do not cover all details or variations in equipment nor do they provide for every possible contingency that
may be met in connection with installation, operation, or maintenance. Should further information be desired or should
particular problems arise that are not covered sufficiently for the purchaser’s purposes, the matter should be referred to the
GE Company.

g

GE Industrial Systems

General Electric Company
41 Woodford Ave., Plainville, CT 06062

GEH5597 R04 0701

© 2001 General Electric Company

Switch

Bottom

Tabs

Interior

Rails

Advertising