Figure 4. screw assembly, Figure 6. connector plug assembly, Figure 7 – GE Industrial Solutions EntelliGuard G Electrical close switch User Manual
Page 2
Figure 2. (A) Front Cover (B) ScrewRemoval (C) Handle
Rotation
3.
Slide the switch assembly over the mechanism
side sheet and locate in the two locating holes as
shown in Fig. 3
Figure3. EC switch assembly
4.
Assemble the screw with washer as shown in
Fig. 4. Tighten the screw to torque 1.2N-m (0.9 ft-
lbs).
Figure 4. Screw assembly
5. Route the wire from the close coil to the side of
the PMU base and pass thru the insulation tube
for the connection with Electrical close switch as
shown in fig.5
Figure5.
6. Plug the connector from the EC switch
assembly to the connector from the command
closing coil beside the PMU base as shown in
Fig 6. Connect the other end of the harness to the
command close coil
Figure 6. Connector plug assembly
Installation of Push button on the fascia:
7. Remove the existing dummy button by
removing the screw as shown in fig 7.
Dummy button
Screw
Figure 7
2