Figure 4. screw assembly, Figure 6. connector plug assembly, Figure 7 – GE Industrial Solutions EntelliGuard G Electrical close switch User Manual

Page 2

Advertising
background image

Figure 2. (A) Front Cover (B) ScrewRemoval (C) Handle

Rotation


3.

Slide the switch assembly over the mechanism

side sheet and locate in the two locating holes as

shown in Fig. 3

Figure3. EC switch assembly



4.

Assemble the screw with washer as shown in

Fig. 4. Tighten the screw to torque 1.2N-m (0.9 ft-
lbs).

Figure 4. Screw assembly

5. Route the wire from the close coil to the side of
the PMU base and pass thru the insulation tube
for the connection with Electrical close switch as

shown in fig.5

Figure5.


6. Plug the connector from the EC switch

assembly to the connector from the command
closing coil beside the PMU base as shown in
Fig 6. Connect the other end of the harness to the
command close coil

Figure 6. Connector plug assembly

Installation of Push button on the fascia:

7. Remove the existing dummy button by
removing the screw as shown in fig 7.

Dummy button
Screw

Figure 7

2

Advertising