Geh-5581p3-p4, For two-pole devices on three-phase systems only – GE Industrial Solutions Spectra Series Power Panelboards 60 A_600 V, 100 A_240 V, 100 A_600 User Manual

Page 3

Advertising
background image

8. Install the cover. Position the new enclosure cover in

place on the enclosure, as shown in Figure 8, and

secure to the hinge with #10-32 x

1

/

4

" screws

tightened to 27–32 in-lb. Reinstall the fusible switch

unit and secure it to the rail locking screws.

Figure 8. Installing the cover on the enclosure.

For Two-Pole Devices on Three-Phase

Systems Only

To balance the panelboard load, remove the screws on the

appropriate bus clip, reposition the bus clip as shown in

Figure 9, then install and tighten the screws to 27–32 in-lb.

Figure 9. Repositioning the bus clip to balance the load.

A & C Phase

As Received

A & B Phase

B & C Phase

Enclosure

Cover

Cover

Mounting

Screws

Advertising