10 error detection, Astat-sd – GE Industrial Solutions ASTAT-SD Solid-State Reduced Voltage Starter User Manual

Page 17

Advertising
background image

2-10 Error detection

LEDs

●

●

OFF

●

ON
BLINKING

O

A

B

C

OPERATION CODE

●

●

●

●

●

●

●

Equipment is connected to main supply

●

●

●

●

●

●

Run

●

●

●

●

●

End of ramp

●

●

●

●

Effective energy saving

●

●

●

●

●

●

Stop order

ASTAT-SD

™

Solid-State Reduced Voltage Starters

Chapter 2. Installation & Start-up

13

30

40

20

50

10

0.5 60

50

4/60

3/40

70

30

2/15 5/80

RAMP(s)

WHEN BLINKING SEE ERROR CODE

ILT/TORQUE

A

B

C

A

0

B
C

RUN

ON

FULL
SAVE

ILT/TORQUE

HD/SD

1 0

KICK START
SOFT STOP
EOR/RUN
OVERRIDE

1

1

LEDs

A B C

Symptom or Error

Possible Cause

Measures to be Taken

LED “O” off

No control voltage

Check wire harness and control voltage

Defective control PCB,s

Change control PCB,s

Equipment does not

Defective control PCB,s

Change control PCB,s

respond to STOP/
START controls

●

●

●

Frequency error

No 1L1 phase of frequency

Check 1L1 phase and/or main

48Hz <f main < 62 Hz) is out of range

frequency

●

●

Phase sequence loss Disturbance in supply voltage Check notches or dropouts in power line

Defective thyristor

Check thyristors

No input phases

Check 1L1, 3L2 and 5L3 phases

●

● ●

●

Synchronism loss

Phase 1L1 lost

Check 1L1 phase, ground connection
and/or output voltage to ground

●

●

●

A Phase A, B, C

Short-circuited thyristor

Check thyristor module

●

●

● B thyristor

No output phases

Check 2T1, 4T2 and 6T3 phases

● ● C

●

●

●

A Phase A, B, C lost

No input/output phases

Check power wire harness for

●

●

●

B

1L1, 3L2, 5L3, 2T1, 4T2 and 6T3

● ●

C

Defective thyristor or bad

Verify gate and cathode wire

wire harness

harness and verify thyristors

●

Internal failure

Microcontroller malfunction

Check that IC2 is correctly inserted
in socket

Advertising