DEH-41483 Rev. 3

Arc Vault™ Protection System

Initial Test and Activation

© 2011 General Electric All Rights Reserved

33

ARC VAULT RELAY CONTROLLER SETUP

In an arcing event the Arc Vault Relay is designed to send a

trip signal to the upstream breaker when the current

threshold level is reached. This will initiate the Arc Vault

device to fire.

NOTICE

There must be control power available to the Arc

Vault Relay Controller in order for settings to be

saved.

Activation switch must be in OFF position to change

settings.

1. There are four choices appearing on the Arc Vault

Relay screen: SETUP, METER, STATUS and EVENTS.

2. Using the touchpad, press the up arrow button ↑ to

scroll to SETUP. Press right arrow button → to select

activation pick up levels.

3. Choices are .8 to 3.0 in .2X increments where .2X = 1000

amps. Choose the desired pick up level by pressing the
up or down arrows ↑↓ . When the desired pick up level
is illuminated press the return button ↵ . The word

SAVED at the top of the screen will illuminate.

4. To set the date and time, press the right arrow button

→ . Three choices will appear. Y for year, M for month
and D for day. Start with Y and using the ↑ or ↓

buttons, choose the last two digits of the current year.
Press ↵ to save. Scroll down to the next choice by
pressing the ← button. Continue with this process until

the day is chosen and saved.

5. Press the → button multiple times until returning to the

main menu.

VERIFY PRIMARY CIRCUIT CURRENT AND VOLTAGE

1. On the Relay screen main menu press the ↓ arrow for

Monitor. Change Monitor to METER.

2. Press the right arrow → button for CURRENT.

3. Press the right arrow → button for 3-phase CURRENT.

4. Press the right arrow → button for 3-phase VOLTAGE.

5. Press the right arrow → button to return to the main

menu.

ARC VAULT SYSTEM ACTIVATION PROCEDURE

1. Locate Activation Switch. See Figure 8-1.

2. Verify all indicator lights are working properly by

rotating Activation Switch counter clockwise and hold.

3. Release Activation switch knob to OFF position.

Indicator lights will go off.

4. Turn Activation switch clockwise to ON position. White

system status light should be on, indicating the system

is in partial protection mode.

Note: The green display on the trip unit will be flashing.

5. To manually charge the device press the black “Push to

Charge” button. Device is now in ready state and

system is in full protection mode. Green and blue lights

will illuminate.

If something is not working correctly in the above steps,

refer to the trouble-shooting table below

For arc vault installation start-up and commissioning

checklist, refer to Field Engineer’s Manual – Industrial Doc.

No. EM 9365.