Part I – Preparation for replacement of a CPU
57
12
Step 3 and 4
•
If the replacement CPU is onsite, the serial number of the replacement cpu must be entered
so the option string can be generated by the factory.
•
Click Ordering New if the CPU is not onsite. An option string will be generated for the new
replacement CPU by the factory.
Figure 12-4 Step 3 – CPU Serial Number dialog box
Figure 12-5 Step 4 – Preparation Finished dialog box
The option string, serial number, and IP address of both CPUs are now saved to the USB drive.