Customize Retrofill Secondary Wiring
WIRING
• Before installing the breaker, the
secondary disconnects must be wired to
the EntelliGuard Breaker.
• Wires with wire markers are provided on
the retrofill. Make sure that the
switchgear wiring connection points
match up with the original wiring of the
cubicle. This ensures that all wiring
connections are properly made.
•
Wrong connections will cause the breaker
to malfunction.
Modify AKD-5 Switchgear Compartment
• It must be ensured that the supply power
to the compartment is turned off/
compartment is de-energized for all the
incoming and outgoing circuits of the LVS
prior to any work being conducted on it.
• During the installation and related work on
the equipment, it must be ensured that the
operator is using the prescribed PPE for the
specified tasks.
• Ensure only qualified personnel install, operate, service, and maintain all electrical
equipment.