GE Industrial Solutions WattStation Connect Reference Guide for the Install User Manual
Page 24
WattStation
TM
Connect Reference Guide
24
©2012 GE Company All Rights Reserved
GE Energy
this to location to indicated
restricted access. Private
charging stations display with a
lock icon on the map.
Time Zone
The time zone in which the
charging station is installed. This
field is automatically populated.
10. Click Next.
11. In Step 4: Group, select a Station Group from the drop-down list.
NOTE: For first time owners, the Station Group list will display
only one default group, General. Assign your station to this
group.
12. Click Provision. You have now successfully provisioned your
charging station.
NOTE: If you are asked to assist the WattStation owner with
other tasks such as establishing station groups or setting up
automatic email notifications, refer to the online Help available
from the Owner’s WattStation Connect web application, at