GE Industrial Solutions Power Break II Draw-out 800-4000 Amp Frames User Manual
Page 8
Advertising
Power Break® II Devices
Draw-Out Device Installation
4
Figure 6. Device installed on rails, ready to be pushed into the
substructure.
Figure 7. Wrench attached to the device racking shaft.
Figure 8. Compartment position indicator on the front of the device.
Racking Tool
Substructure
Rejection
Feature
.06 in
minimum
Device
Rejection
Feature
Compartment
Position Indicator
Advertising