Installation Guide TLE Series 225 - 500 UL S1

4.8.1 TLE Series 225 & 250 - Power connection with Common Input Utility

Fig. 4.8.3-1 TLE Series 225 & 250 - Power connections Common Input Utility

Power connection cables are connected to bus bars using M10 bolts.
The bolts of the connection cables must be tightened with a torque wrench at 355 Lb-in / 40 Nm.

Common Input Utility - Rectifier / Bypass

L1-1

Rectifier + Bypass Phase A (L1)

L2-1

Rectifier + Bypass Phase B (L2)

N

Neutral

L3-1

Rectifier + Bypass Phase C (L3)

PE

Ground

NOTE !

The interconnection links BR1, BR2 and BR3 (option) on the input bus bars MUST
REMAIN CONNECTED.

Output Load

L1

Load phase A (L1)

L2

Load phase B (L2)

L3

Load phase L3

N

Neutral

Ground

External Battery connection

+

Positive pole of the battery

UPS PARALLELED ON THE SAME BATTERY:

This configuration is not possible for UPS Parallel
System TLE Series 225 & 250.

Before closing the “External Battery Fuses”
, verify for
correct polarity of the battery connection
.

-

Negative pole of the battery

PE

Battery cabinet ground

NOTE !

To meet standards concerning electromagnetic compliance, the connection between the
UPS and external Battery
must be done by using a shielded cable or suitable shielded (steel)
conduit!
This UPS is only designed to operate in a wye-configured electrical system with a solidly
grounded neutral.
If the UPS is equipped with an input bypass transformer, the secondary of the transformer
must be wye-configured with neutral solidly grounded.

+

-

Typical installation

using common NEMA

two hole lugs

PE

TLES_UL_22

5-250_S1_

UPS conne

ction comm

on_01US

1

Rectifier & Bypass

Utility

L1-1

N

Utility Neutral
Load Neutral

Load

L1

L2-1

L2

L3-1

L3

INTERCONNECTIONS LINKS
BR1, BR2 and BR3
MUST REMAIN CONNECTED

!