Installation guide, Aspmeter – GE Industrial Solutions ASPMETER Install User Manual
Page 8
![background image](/manuals/295392/8/background.png)
TM
ASPMETER
INSTALLATION GUIDE
Z206024-0B
PAGE 8
©2011 For technical support please contact
10111
DET-756
our GE tech support team at 1-800-GE-1-STOP (1-800-431-7867)
3. Verify that the serial numbers printed on the current strip and on the data
acquisition board match. The board and the strip are sold as a calibrated set.
4. Configure communication and addressing parameters using DIP switches. See the
Configuration section for more information.
5. Install the ASPMETER acquisition board mounting bracket in the panel using
screws and bolts provided (Figure 3). A grounding connection is located on the
mounting bracket, near the lower right corner. Use this stud to ground the bracket
when it is mounted on a plastic surface.
6. Connect current sensor ribbon cables to the 50-pin connectors on the main board
(Figures 4 and 5). Orient cables so that the red stripe is on the left.
E30 CURRENT SENSOR STRIP
E30 CURRENT SENSOR STRIP
Figure 3
Figure 4
Align ribbon cable key with
connector keyhole.
Orient ribbon cable so that the
red stripe is on the left side of
the connector.
Red Stripe
Figure 5
L1 L2 L3 N
Panel 1
A
B