Installation, Znet900(a/b) annunciator – GE Industrial Solutions ZNET901 User Manual

Page 4

Advertising
background image

Installation

ZNET900(A/B) Annunciator

1. Remove cover panel (see Figure below).
2. Mount unit to wall.
3. Connect network connection as shown.
4. Connect power input as shown.
5. Reinstall cover.

POWER LED

SERVICE LED

GROUND

POWER

POWER

NETWORK

NETWORK

SERVICE SWITCH

SW1

SERIAL
PRINTER
PORT

DATA

CLOCK

+5V

COM

COM

D-IN

24V

AC/DC

24V

POWER LED

SERVICE LED

GROUND

POWER

POWER

CUSTOMER SUPPLIED *

24V AC or DC INPUT

(40 VA REQUIRED)

NETWORK

NETWORK

SERVICE SWITCH

AC/DC

USE

BELDEN

8471

SW1
DIP
SWITCH

SERIAL
PRINTER
PORT

DATA

CLOCK

+5V

COM

COM

D-IN

ZNET901

EXTENSION

CONNECTIONS

(SEE PAGE 3)

USE

BELDEN

8471

2

ZNET900A, ZNET900B and ZNET901 Operation and Maintenance Manual (18R-1000)

Zenith Controls, Inc.

* Adapters Available - Contact Factory

Advertising