GE Industrial Solutions BreakMaster Load Interrupter Switch User Manual

Page 2

Advertising
background image

1

Overview

This instruction book is expressly intended to cover the installation, operation and maintenance of GE’s BreakMaster Load
Interrupter Switch. This manual does not cover all possible contingencies, variations and details that may arise during
installation, operation or maintenance of this equipment.

If the user has questions regarding a particular installation, contact the local GE sales office. For application information,
consult your nearest GE sales office and refer to the appropriate ANSI standards.

Contents

Page

Section 1 - Introduction

2

1.0 Basic Description and Application
1.1 Switchgear Identification
1.2 Safety Features
1.3 Safe Practices

Section 2 - Receiving

4

2.0 Receiving
2.1 Handling
2.2 Storage
2.3 Lifting Instructions

Section 3 - Feature Identification

5

Section 4 - Installation

6

4.0 Joining BreakMaster Enclosures
4.1 Connection of Switchgear to Transformer
4.2 Bolting Torque Valves
4.3 Electrical Clearances
4.4 Grounding
4.5 Medium Voltage Electrical Connections
4.6 Connection to Metal Clad Switchgear Assembly
4.7 Connection of Customer Power Cables
4.8 Field Taping of Electrical Connections
4.9 Securing Switchgear to Foundation
4.10 Connection of Space Heaters to Customer’s Source
4.11 Switch Inspection Before Startup

Section 5 - Operation

13

5.0 Mechanical Safety Interlocks
5.1 Switch Operation
5.2 Fuse Replacement Steps
5.3 Shunt Trip Operating Guidelines
5.4 Motor Operator

Section 6 - Maintenance

21

6.0 General Requirements

Section 7 - Selector Switch Configuration

23

Section 8 - Duplex Configuration

23

Section 9 - Auto Transfer Switchgear (LIS-ATS) Configuration

24

Section 10 - Troubleshooting

26

Section 11 - How to Contact GE

27

11.0 GE RESOLVE
11.1 www.geelectrical.com

BreakMaster Load Interrupter Switch

Advertising