GE Industrial Solutions SG Series 400 & 500 Operating Manual User Manual
Page 52
Modifications reserved
Page 52/79
OPM_SGS_USM_M40_M50_2US_V010.doc
User Manual SG Series 400 & 500 UL S2
4. Open the Manual Bypass Switch Q2 (Pos. O).
•
The Load is supplied by the Utility through the Automatic Bypass.
•
LED 8 (Automatic Bypass ON) is lit and LED 9 (Manual Bypass Q2 ON) turns OFF.
The Synoptic Diagram must display the status “LOAD
SUPPLIED BY AUTOMATIC BYPASS”.
5. Insert the Inverter by pressing the “Inverter ON” ( I ) key.
•
Soft-start of Inverter, indicated with blinking LED 5 (Inverter available).
•
At the end of Soft-start the LED 5 (Inverter available) remains lit.
•
Automatic transfer from Automatic Bypass to Inverter.
•
LED Alarm turn Off and the LED Operation must be lit.
The Synoptic Diagram must display the status “LOAD
SUPPLIED BY INVERTER”.
END OF PROCEDURE