7.2.2 Parallel System shutdown with Load transfer on External Maintenance Bypass

(option)

NOTE !

Not following this procedure can cause protected loads to shut down!
Never close or open either UPS Output Switch Q1
and External Maintenance Bypass
Switch
(option) with the Inverter running!
Initial situation: the Load
is powered by all Inverters of the Parallel System.
If eBoost™
option is available, make sure that eBoost™ Operation Mode is disabled
before starting the shutdown procedure.
The complete UPS Parallel System
has to be turned OFF, while providing the Load
power by Utility
through a single External Maintenance Bypass (option).



With the UPS Parallel System in normal operation and the Inverters supplying the Load, the UPS Output
Switches Q1
, Input Circuit Breakers CB4 and the Battery Bank Breakers are closed (Pos. I) and the
External Maintenance Bypass Switch
(option) is open (Pos. O).


The Synoptic Diagram, on all UPS units, must display the

statusLOAD SUPPLIED BY INVERTER.




1. Disconnect the Inverter by pressing the “Inverter OFF” ( O ) key on all Units, and hold until the

LED 5 (Inverter available) turns OFF

At no redundancy, the system will transfer to Utility supply.
LED 5 (Inverter available) is Off
LEDs Alarm
are lit and the LEDs Operation are Off.

The Synoptic Diagram, on all UPS units, must display the

statusLOAD SUPPLIED BY AUTOMATIC BYPASS.

2. Transfer the Load from Internal Automatic Bypass to External Maintenance Bypass (option).

Use the External Maintenance Bypass panel instructions to transfer the Load from the UPS to External

Maintenance Bypass Breaker (MBB).

After this step, the Load is supplied by the Utility through the UPS Automatic Bypass of all units and single

External Maintenance Bypass (option).

3. Open the UPS Output Switch Q1 (Pos. O) on all UPS units.

The Load is now supplied only through the External Maintenance Bypass.