4 customer interface, Customer interface, 4customer interface – GE Industrial Solutions SG Series 750 T12 UL S2 Installation Guide User Manual
Page 44: Cr2 cr1, Service center
Advertising
![background image](/manuals/295699/44/background.png)
Modifications reserved
Page 44/49
OPM_SGS_ISG_M75_M75_2US_V010.doc
Installation Guide SG Series 750 UL S2 & SG Series 750 T12 UL S2
4
CUSTOMER INTERFACE
Connectivity Rack CR1 and CR2
SGS_750_UPS
_CR1-CR2_01
Q1
CR2
CR1
18
2
19
20
89
7
22
11
1
21
10
2
1
2
3
4
3
4
14
15
34
16
17
56
12
12
13
1
SG Series 750 & SG Series 750 T12 are
delivered with 2 Connectivity Rack (CR1
and CR2).
CR1 Connectivity Rack with a
Customer Interface (see Section
4.1)
CR2 Connectivity Rack for additional
Customer Interface (option)
WARNING !
The installation of the option “Additional Customer Interface” must be
performed by a SERVICE ENGINEER from of your
Service Center
.
The operation must be performed with the UPS system COMPLETELY SHUTDOWN.
Advertising