2 power connection with common input utility, Power connection with common input utility – GE Industrial Solutions SG Series 50 & 80 kVA Installation Guide User Manual

Page 24

Advertising
background image

3.8.2 Power connection with common input utility

BYPASS

RECTIFIER

1 -

&

INPUT

SGT5000_0

50-

080_UPS

conne

c

ti

o

n

co

mmon_02

US

OF

F

ON

ON

OF
F

X1

LOAD

L1-1

L2-1

L3-1

PE

N

L1

L2

L3

N

PE

Fig. 3.8.2-1 Power connections Common Input Utility

SG Series 50 & 80 kVA

Max. rating X1 terminals:

4/0 AWG (95mm

2

)

Common Input Rectifier / Bypass

L1-1

Rectifier + Bypass Phase A

L2-1

Rectifier + Bypass Phase B

L3-1

Rectifier + Bypass Phase C

N

PE

Neutral

Ground

Output Load

L1

Load Phase A

L2

Load Phase B

L3

Load Phase C

N

PE

Load Neutral

Load Ground

The interconnection links BR1, BR2 and BR3 MUST REMAIN CONNECTED.
Cable terminations are to the Rectifier Input Terminals and Output Terminals as shown above.
Connect wire to the Terminals using appropriate tools and appropriate torque.
Torque specification for Input / Output and DC power connections on Terminals: see Section 3.8.1.

NOTE !

This UPS is only designed to operate in a wye-configured electrical system with a
solidly grounded neutral.
If the UPS is equipped with an input transformer, the secondary of the transformer
must be wye-configured with neutral solidly grounded.

Modifications reserved

Page 24/38

OPM_SGS_ISG_50K_80K_0US_V040.doc

Installation Guide SG Series 50 & 80 kVA

Advertising