GE Industrial Solutions SG Series 100 – 120 – 150 kVA Operating Manual User Manual
Page 60
Advertising
Modifications reserved
Page 60/82
OPM_SGS_USM_M10_M15_0US_V030.doc
Operating Manual SG Series 100 – 120 - 150 kVA
3. Disconnect the Battery, in case of External Battery, from all Units.
• Wait 5 minutes for DC-Link Capacitors discharge
.
First operated unit
All other units of the system
4. Disconnect the Utility supply from all Units.
• All LED’s are OFF.
First operated unit
All other units of the system
END OF PROCEDURE
Advertising