Major overhaul – Bell & Gossett MK MV (8202, 8202X) User Manual

Page 39

Advertising
background image

Service item

Action

Cable

1. If the outer jacket is damaged, replace the cable.
2. Check that the cables do not have any sharp bends and are not

pinched.

Connection to power

Check that the connections are properly tightened.

Electrical cabinets

Check that they are clean and dry.

Impeller

1. Check the impeller clearance.
2. Adjust the impeller, if necessary.

Stator housing

1. Drain all liquid, if any.
2. Check the resistance of the leakage sensor.

Normal value approximately 1530 ohms, alarm approximately

330 ohms.

Insulation

Use a megger maximum 1000 V.

1. Check that the resistance between the earth (ground) and

phase lead is more than 5 megohms.

2. Conduct a phase-to-phase resistance check.

Junction box

Check that it is clean and dry.

Lifting device

Check that local safety regulations are followed.

Lifting handle
: Ex-version

1. Check the screws.
2. Check the condition of the lifting handle.
3. Replace if necessary.

Lifting eye bolts: Standard version

1. Check that they are screwed firmly against the base.
2. Check that they are situated on same plane.
3. Check the condition of the lifting eye bolt.
4. Replace if necessary.

O-rings

1. Replace the oil plug O-rings.
2. Replace the O-rings at the entrance or junction cover.
3. Grease the new O-rings.

Personnel safety devices

Check the guard rails, covers, and other protections.

Rotation direction

Check the impeller rotation.

Oil housing

Fill with new oil, if necessary.

Terminal board block/closed end

splice

Check that the connections are properly tightened/connected.

Thermal contacts

Normally closed circuit; interval 0–1 ohm.

Voltage and amperage

Check the running values.

Major overhaul

For a major overhaul, take this action in addition to the tasks listed under Inspection.

Maintenance