Installation – Xylem MM 206F Series 63 Low Water Cut-Off User Manual

Page 2

Advertising
background image

Gauge Glass Mounted

Directly into Boiler

CUT-OFF
LEVEL

1" BLOW DOWN

VALVE

For Boilers with

Independent Water Columns

1" STEAM

EQUALIZING PIPE

MODEL 63
LOW WATER
CUT-OFF

1" WATER

EQUALIZING PIPE

1" WATER

EQUALIZING PIPE

1" WATER

EQUALIZING PIPE

CUT-OFF
LEVEL

MODEL 63
LOW WATER
CUT-OFF

2

a. Whether the gauge glass is mounted directly into the boiler or on an independent water column, the

cut-off line on the 63 body casting should be mounted 1/2” (15mm) above the lowest visible point of the
gauge glass.

a. Locate the gauge glass and

determine the level that the 63
has to be mounted at in order
to achieve the criteria in Step 1.

b. Pipe the 63 following the

diagrams shown to the right.
Follow the diagram that
represents your boiler.

c. Crosses should be used at

each right angle connection for
inspection and cleaning.

d. Make sure the blow-down

valves are full port.

e. While the burner is operating,

open the blow-down valve,
causing the water level to drop in
the float chamber while burner is
operating. As the float drops the
alarm circuit (if used) closes first;
then on further drop the cut-off
circuit will open, shutting the
burner off.

f. Test the Model 63 before leaving

the site.

STEP 2 - Installation of the Model 63

Model 63 – For Steam Boilers with 1” (25mm) Equalizing Lines

INSTALLATION –

TOOLS NEEDED:
One (1) flathead screwdriver and two (2) pipe wrenches.

STEP 1 - Determine the Location of the Low Water Cut-Off

For 63 models with float block

CUT OFF

LEVEL

A

Using pipe wrench

• Remove float blocking plug (A) from low

water cut-off body tapping.

• Screw 3/4” NPT steel plug (provided) in

tapping.