Installation, Warning, Step 1 - preparation – Xylem MM 219J Replacement Head Mechanism User Manual

Page 5: Caution

Advertising
background image

• To prevent serious burns, the boiler must be cooled to 80˚F (27˚C) and the pressure must be 0 psi (0 bar)

before servicing.

• To prevent electrical shock, turn off the electrical power before disconnecting or making electrical connections.

Failure to follow this warning could cause property damage, personal injury or death.

!

WARNING

5

A

B

C

D

c. Remove the existing head mechanism (C)

from the body (D).

a. Drain water in the boiler to a level which is

below the float chamber (A). Allow the boiler
to cool to 80˚F (27˚C) and release the boiler
pressure to 0 psi (0 bar).

b. Using a flathead screwdriver, remove the junction

box cover (B). Disconnect, mark, and remove the
supply wires and conduit connections.

F

E

d. Using a scraper, remove the old gasket (E).

Clean all debris from the float chamber. The
gasket sealing surface (F) must be smooth
and clean.

STEP 1 - Preparation

INSTALLATION

TOOLS NEEDED:
One (1) pipe wrench, one (1) flathead screwdriver, one (1) scraper, and one (1) 9/16" socket or wrench.

There may be more than one source of power to the boiler.

!

CAUTION

Advertising