Installation, Step 1 - preparation, Caution – Xylem MM 413F Replacement Head Mechanism With Switch Assembly: 93-HD, 93-M-HD, 93-7B-HD, 93-7B-M-HD, 94-HD 94-M-HD 94-7B-HD 94-7B-M-HD User Manual

Page 3: Step 2 - head removal

Advertising
background image

3

OFF

ON

STEP 1 - Preparation

INSTALLATION –

TOOLS NEEDED:
One (1) flathead screw driver, one (1) scraper and
one (1) 9/16" socket box or open end wrench.

a. Turn power off to boiler and all controls.

FLOAT

CHAMBER

b. Allow boiler to cool to 80˚F (27˚C) and

reduce pressure to 0 psi (0 bar).

Drain water in boiler to a level that is
below the float chamber.

There may be more than one source of power to
the boiler.

!

CAUTION

TOWER TUBE

SWITCH
ASSEMBLY

SWITCH
COVER

TERMINAL
PANELS

CONDUIT
CONNECTOR

FITTING
HUB

B

A

a. Disconnect and Remove Wires.

For Replacement Heads with Switches
(-HD Models)

Remove two screws (A) and lift off switch

cover.

Identify terminal connections for rewiring

and then disconnect all wires from
terminal panels.

Remove conduit connection and wires

from integral fitting hub.

For Replacement Heads without Switches
(-HDLS Models)

Remove four hex nuts (B) and carefully lift

switch assembly up and off tower tube.

STEP 2 - Head Removal

Advertising