Step 3 - electrical installation, Warning – Xylem MM 619F Series FS6 Flow Switch User Manual

Page 5

Advertising
background image

5

A

a. Cover Removal and Installation Procedure

For FS6 models with NEMA 1 Enclosure

• Using a flathead screwdriver, loosen but do not

remove the two cover screws and remove the cover
(A).

• Place the cover on the flow switch sliding the slots

behind the two loose cover screws. Push the cover
down into the flow switch and using a flat blade
screwdriver, tighten the cover screws to a torque of
10 lb•in (1.13 N•m).

For FS6-W models with NEMA 4X Enclosure

• Using flathead screwdriver, unscrew the six cover

screws and remove cover.

• Place the electrical connection cover on the flow

switch and insert the six cover screws. Tighten the
screws to a torque of 10 lb•in (1.13 N•m).

STEP 3 - Electrical Installation

• To prevent electrical shock, turn off the electrical power before making electrical connections.

• To prevent an electrical fire or equipment damage, electrical wiring insulation must have a rating of

167˚F (75˚C) if the liquid’s temperature exceeds 180˚F (82˚C).

• To prevent electrocution, when the electrical power is connected to the flow switch, do not touch the

terminals.

• Make sure flow switch electrical cover is secured before turning on electric power.

Failure to follow this warning could cause property damage, personal injury or death.

!

WARNING

b. Electrical Conduit Connection

• Connect electric conduit to flow switch electrical enclosure.

• Follow accepted electrical practices when installing fittings

and making connections.

• Refer to and follow local codes and standards when

selecting the types of electrical fittings and conduit to
connect to flow switch.

Advertising