Installation, Step 1 - preparation, Caution – Xylem MM 702E Series 14-B Ball Type Blow Down Valve User Manual

Page 2

Advertising
background image

2

b. Shut off the inlet water supply by closing the make

up water feed valve.

c. Open the blow down valve (D). Drain

the control (A) to a point where no addi-
tional water can enter the control. Let
the control (A) and surrounding equip-
ment to cool to 80˚F (27˚C) and allow
pressure to release to 0 psi (0 bar).

A

D

A

D

d. Using a pipe wrench (B), remove the

blow down pipe (C) from the existing
blow down valve (D).

B

D

C

C

D

B

STEP 1 - Preparation

INSTALLATION –

TOOLS NEEDED:
One (1) flathead screwdriver, one (1) scraper, one (1) pipe
wrench, one (1) hammer, and pipe sealing compound.

a. Shut off the boiler and disconnect the power to the

entire boiler system.

OFF

ON

OR

OR

To prevent serious burns, wear heat resistant gloves when opening and closing valves, or handling hot
equipment.

To prevent serious burns, allow the control and surrounding equipment to cool to 80˚F (27˚C) and allow
pressure to release to 0 psi (0 bar) before servicing.

Failure to follow this caution could cause personal injury.

!

CAUTION

Advertising