Proceed to step 2 to test control – Xylem MM 714C Replacement Pump and Burner Switch Arm Contacts with Terminal Panel User Manual

Page 3

Advertising
background image

3

NOTCH

NOTCH

5 / 5-M

TERMINAL PANEL

ORIENTATION

2

4

1

BLUE

RED

3

3

1

4

2

A

C

E

TOWER TUBE

FITTING HUB

SWITCH
HOUSING

TERMINAL
CONNECTIONS

SWITCH
COVER

PUMP

TERMINAL

PANEL

BURNER

TERMINAL

PANEL

CONDUIT
CONNECTOR

NAMEPLATE

NAME PLATE

BASE
PLATE

B

D

d. Replace Switch Housing, Switch

Assembly and Reconnect Wiring

• Replace switch housing and fasten to

base plate with four screws (E).

• Move burner switch arms to upright position

by reaching through nameplate opening
and holding burner switch lever midway
between stops. Carefully set burner
terminal panel
in position and fasten with
screws (D). Do not force. (See diagram at
lower right for proper orientation of
terminal panel).

• Move pump switch arms to upright position

by reaching through nameplate opening
and holding pump switch lever midway
between stops. Carefully set pump
terminal panel
in position and fasten with
screws (D). Do not force. (See diagram
at lower right for proper orientation of
terminal panel).

• Check visually to see that contact arms

are in proper position between terminal
panel contacts and move lever up and
down to see that switch operates freely
and smoothly.

• Carefully slide switch assembly over

tower tube and secure with four hex
nuts (B).

• Install conduit connector and wires to

the integral fitting hub on switch
assembly
.

• Reconnect wiring to terminal panel in

exactly the same position as removed.

• Replace switch cover and fasten with

two screws (A).

• Replace nameplate and fasten with

two screws (C).

F

G

H

I

c. Remove and Replace Switch Arm Contacts

• Remove two screws (F) and lift off bus bar

(G), contact arms (H) and insulator (I).

• Place new insulator (I), contact arms (H) and

bus bar (G) in position and fasten with two
screws (F). Make sure the contact arm blades (H)
are in alignment and at right angle to insulator.

Proceed to Step 2 to Test Control

Advertising