Vi. installation, Do not connect directly to line voltage, Not for use in hazardous (explosive) environments – Xylem WL200 CONDUCTIVITY LEVEL CONTROLLERS User Manual

Page 8: Do not exceed pressure and temperature ratings, A. conductivity sensor head / conductivity probes, 1 inch npt (standard), B. wiring

Advertising
background image

Global Water

800-876-1172

globalw.com

VI. Installation

Warnings:

Install controller according to applicable electrical codes.
Unit must be installed using Global Water’s R2 Controller.
Do not connect directly to line voltage.
Not for use in hazardous (explosive) environments.

Do not exceed pressure and temperature ratings.

a. Conductivity Sensor Head / Conductivity Probes

1. 1 inch NPT (Standard)
2. Probes can be cut to length. Remove probes from sensor head by

carefully unthreading them from inserts. Do not over tighten when
reinstalling.

3. Cut two (2) probes to the same length, these will be the common

and lower level probes. (See Figure 1, page 11.)

4. Cut one (1) probe to the desired length for the upper level of the

tank. (See Figure 1, page 11.)

5. Spacer should be located approximately 1 inch from bottom of

shortest probe.

6. If build up occurs on probes a short circuit could occur. If this

happens, apply shrink tubing to the probes leaving the last one (1)
inch bare.

b. Wiring

1. Install cable into sensor head through the compression fitting

supplied.

2. Attach one lead between the common probe terminal, and pin five

(5) on the controller.

3. Attach a second lead between the lower level probe terminal, and

pin six (6) on the controller.

4. Attach a third lead between the upper level probe terminal, and pin

eight (8) on the controller.

5. Tighten compression fitting until cable can not be pushed into

sensor head.

- 8 -