Installation and operation, Installation overview, Mounting the ipl t cr48 – Extron Electronics IPL T CR48 User Manual

Page 9: Installation overview mounting the ipl t cr48

Advertising
background image

Installation and

Operation

This section describes the installation and the operation of the IPL T CR48. Topics that are
covered include:

z

z

Installation Overview

z

z

Mounting the IPL T CR48

z

z

Rear Panel Features and Cabling

z

z

Operation

Installation Overview

To install and set up the IPL T CR48, follow these steps:

1.

Turn all of the equipment off. Make sure that the input devices (such as motion
detectors and alarms), the IPL T CR48, and the output devices (such as projectors or
screen lifts) are all turned off and disconnected from the power source.

2.

Mount the IPL T CR48 unit (see

Mounting the IPL T CR48

).

3.

Attach the cables (see

Connecting the Hardware

in the “Connection and

Configuration” section.

4.

Connect power cords and turn on the devices in the following order: output devices
(projector lifts, screen lifts, lighting system, and so on), IPL T CR48, serial controller or
computer (PC), then input devices (DSS, cable boxes, and so on).

5.

Configure the IPL T CR48 through Telnet, then access the unit using an Internet browser.

Mounting the IPL T CR48

Optional rack shelves and an assortment of mounting kits (furniture and projector mount)
are available for use with the IPL T CR48 controller. See the

Specifications and Part

Numbers

section for the part numbers of these accessories. Read the instructions provided

with the rack shelf or mounting kit for installation procedures.

The IPL T CR48 includes rubber feet so that it can be set on a table. If you are going to
mount the unit to a rack shelf, furniture, or pole, and these feet were attached to the
controller, remove the feet before mounting.

IPL T CR48 • Installation and Operation

3

Advertising