PoleVault Systems Installation • Installation — Stage 2
Stage Three — Install the FF 120 Ceiling Speakers
Stage 3
This stage involves installing the devices shown below.
Where it goes:
Installs in ceiling tiles at predetermined location for best acoustics. Connects to switcher.
What it does:
Receives and outputs audio signal from PVS 305SA switcher
FF 120 Flat Field Ceiling Speakers
Anchor Rings (2)
Cable Clamps (2)
Terminal Cover
T-rails (2)
FF 120 Speaker (2)
Seismic Tabs (3 per side)
SPK 18, 35 ft
Speaker Installation:
•
Speaker cable (connects ceiling speakers to the PVS 305SA switcher)
Cables