Gorman-Rupp Pumps UNIT 608 1395614 and up User Manual
Page 10

UNIT SERIES
OM-01228
PAGE B - 3
INSTALLATION
CONTAMINANT TANK
(USER SUPPLIED)
SUCTION/DIS
CHARGE RECIR
CULATION HOSES
DIVERTER VALVE
EDUCTOR
MOTOR
PUMP
CLEANOUT
HOSE
STANDPIPE
(GUIDE TUBE)
REEL ASSEMBLY
TANK
RETURN
HOSE
Figure 2. Typical Installation
Perform the following steps, which are illustrated
by Figures 3 through 10, to set up the Tankleenor
R
system for operation.
Figure 3.
See Figure 3 and fill a 55 gallon (208 L) drum (not
supplied) or other ventilated container with
approximately 20 gallons (76 L) of operating liquid
(water). Depending on the size and contamination
of the tank being cleaned, more than one drum
may be required.
Figure 4.
See Figure 4 and install the quick‐connect fittings
on the suction and discharge hoses to the eductor
discharge and pump suction. Submerge the other
ends of the hoses in the drum containing the oper
ating liquid (shown in Figure 2).