Installation - section b – Gorman-Rupp Pumps 04E1-GA 1171927 and up User Manual

Page 8

Advertising
background image

OM−03745

0 SERIES

PAGE B − 1

INSTALLATION

INSTALLATION − SECTION B

Review all SAFETY information in Section A.

Since pump installations are seldom identical, this
section offers only general recommendations and
practices required to inspect, position, and ar-
range the pump and piping.

Do not test or operate your pump and in-
tegral gearbox before reading the in-
stallation and operation instructions in
this manual.

This pump is a self-priming centrifugal model with
an integral speed increasing gearbox assembly.
The pump is designed for vehicular mounting in
water or petroleum service, where the liquid is
supplied to the pump under pressure. Since the
pressure supplied to the pump is critical to per-

formance and safety, be sure to limit the incoming
pressure to 50% of the maximum permissible oper-
ating pressure as shown on the pump perform-
ance curve (see Section E, Page 1).

The integral gearbox is designed to be driven
through the vehicle transfer case by a customer-
supplied universal shaft assembly. The pump cas-
ing or gearbox may be rotated in 45

_ increments to

assist with alignment with the vehicle tank; howev-
er, if the gearbox is to be rotated, some modifica-
tions must be made to the gearbox to ensure ade-
quate lubrication. Consult the factory for details.

For further assistance, contact your Gorman-Rupp
distributor or the Gorman-Rupp Company.

Pump Dimensions

See Figure 1

for the approximate physical dimen-

sions of this pump

.

OUTLINE DRAWING

Figure 1. Pump Model 04E1−GA

Advertising