Lines With a Bypass

Close the discharge throttling valve (if so
equipped) so that the pump will not have to prime
against the weight of the liquid in the discharge
line. Air from the suction line will be discharged
through the bypass line back to the wet well during
the priming cycle. When the pump is fully primed
and liquid is flowing steadily from the bypass line,
open the discharge throttling valve. Liquid will then
continue to circulate through the bypass line while
the pump is in operation.

Lines Without a Bypass

Open all valves in the discharge line and start the
engine. Priming is indicated by a positive reading
on the discharge pressure gauge or by a quieter
operation. The pump may not prime immediately
because the suction line must first fill with liquid. If
the pump fails to prime within five minutes, stop it
and check the suction line for leaks.

After the pump has been primed, partially close the
discharge line throttling valve in order to fill the line
slowly and guard against excessive shock pres-
sure which could damage pipe ends, gaskets,
sprinkler heads, and any other fixtures connected
to the line. When the discharge line is completely
filled, adjust the throttling valve to the required flow
rate.

Leakage

No leakage should be visible at pump mating sur-
faces, or at pump connections or fittings. Keep all
line connections and fittings tight to maintain maxi-
mum pump efficiency.

Liquid Temperature And Overheating

The maximum liquid temperature for this pump is
110

_ F (43_ C). Do not apply it at a higher operat-

ing temperature.

Overheating can occur if operated with the valves
in the suction or discharge lines closed. Operating

against closed valves could bring the liquid to a
boil, build pressure, and cause the pump to rup-
ture or explode. If overheating occurs, stop the
pump and allow it to cool before servicing it. Refill

the pump casing

with cool liquid.

Allow an over-heated pump to cool be-
fore servicing. Do not remove plates,
covers, gauges, or fittings from an over-
heated pump. Liquid within the pump
can reach boiling temperatures, and va-
por pressure within the pump can cause
parts being disengaged to be ejected
with great force. After the pump cools,
drain the liquid from the pump by re-
moving the casing drain plug. Use cau-
tion when removing the plug to prevent
injury to personnel from hot liquid.

Strainer Check

If a suction strainer has been shipped with the
pump or installed by the user, check the strainer
regularly, and clean it as necessary. The strainer
should also be checked if pump flow rate begins to
drop. If a vacuum suction gauge has been in-
stalled, monitor and record the readings regularly
to detect strainer blockage.

Never introduce air or steam pressure into the
pump casing or piping to remove a blockage. This
could result in personal injury or damage to the
equipment. If backflushing is absolutely neces-
sary, liquid pressure must be limited to 50% of the
maximum permissible operating pressure shown
on the pump performance curve. (See Section E,
Page 1). If the pump is fitted with a Gorman-Rupp
double grease lubricated seal, the maximum in-
coming pressure must be reduced to 10 p.s.i.

Pump Vacuum Check

With the pump inoperative, install a vacuum gauge
in the system, using pipe dope on the threads.
Block the suction line and start the pump. At oper-

Advertising