Gorman-Rupp Pumps 03F3-B 463273 and up User Manual

Page 27

Advertising
background image

0 SERIES

OM-01189

MAINTENANCE & REPAIR

PAGE E - 8

IMPELLER

SHAFT

SEAL

PLATE

ROTATING

ELEMENT

RETAINER

SPRING

IMPELLER

BELLOWS

SHAFT

SLEEVE

O‐RING

STATIONARY

ELEMENT

Figure 3. Seal Assembly

This seal is not designed for operation at
temperatures above 160

_F (71_C). Do not

use at higher operating temperatures.

Lay the seal plate (9) on a flat surface with the im­
peller side facing up.

Subassemble the O‐ring onto the stationary ele­
ment and use even pressure to press this subas­
sembly into the seal plate until it seats squarely
against the shoulder bore.

Carefully slide the assembled seal plate and sta­
tionary seal element over the shaft. Use caution not
to nick or damage the stationary seat. Temporarily
secure the seal plate to the pedestal with two caps­
crews and nuts (not supplied).

Subassemble the rotating element into the retainer
and bellows. Lubricate the I.D. of the bellows with
water, and slide this subassembly over the shaft

sleeve until the seal face is just flush with the under­
cut end of the sleeve.

Slide the assembled shaft sleeve and rotating por­
tion of the seal and onto the shaft until the polished
faces contact. Continue to push the sleeve through
the seal until it is fully seated against the shaft
shoulder.

Install the seal spring.

Impeller Installation

Inspect the impeller and replace it if cracked or
badly worn.

Screw the impeller onto the shaft until tight. Make
sure the seal spring seats squarely over the shoul­
der on the back of the impeller.

Pump Reassembly

If removed at disassembly, press the replacement
wear ring (24) into the pump casing until it seats
squarely against the shoulder bore.

Advertising