Elmo Rietschle C-KLR 80/140 User Manual

Page 14

Advertising
background image

14

|

www.gd-elmorietschle.com © Gardner Denver Schopfheim GmbH, Gardner Denver Deutschland GmbH

Installation

5 Installation

5.1

Preparing for installation

Check the following points:

Machine freely accessible from all sides

Do not close ventilation grids and holes

Suffi cient room for installing and removing pipes
and for maintenance work, particularly for install-
ing and dismantling the machine

No external vibration effects

Do not suck any hot exhaust air from other ma-
chines into the cooling system.

The oil fi lling point (Fig. 2/H), oil sight glass (Fig. 2/I) and the oil outlets (Fig. 2/K) must be easily
accessible. The cooling air inlets (Fig. 2/E) and the cooling air outlets (Fig. 2/F) must be at least
20 cm away from adjacent walls. Cooling air coming out must not be sucked in again.
For maintenance work there must be a minimum of 40 cm in front of the inlet fi lters (Fig. 2/S, 2/S

1

).

5.2 Installation

NOTICE

The machine may only be operated when it is
set up horizontally.

Material damage resulting from the machine
tipping over and falling.

When installed at more than 1000 m above sea
level a reduction in power is noticeable. In this
case we would ask you to contact us.

Ensure that the foundation complies with the follow-
ing conditions:

Even and level

The bearing surface must be designed to be
able to take the weight of the machine

It is possible to install the machine on a fi rm base without anchoring. When installing on a sub-
structure we recommend fi xing with fl exible buffers.

Advertising