Elmo Rietschle V-VCB 20/25 User Manual

Page 18

Advertising
background image

18

|

www.gd-elmorietschle.com © Gardner Denver Schopfheim GmbH, Gardner Denver Deutschland GmbH

Commissioning and decommissioning

6.1.1 Checking the rotation direction

The drive shaft direction of rotation is shown by

the rotation direction arrow (Fig. 2/O) on the mo-
tor fl ange.

a) Start the motor briefl y (max. two seconds) to

check the direction of rotation. When looking at
the motor fan, it must rotate anti-clockwise.

NOTICE

Incorrect direction of rotation
Operating in the wrong direction of rotation leads
to damage to the machine.
Use a phase sequence indicator to check the direc-
tion of rotation (clockwise rotating fi eld).

b) After correcting the direction of rotation if nec-

essary, start the motor again and stop it again
after 2 minutes in order to top missing oil up to
the upper edge of the sight glass (Fig. 2/I). This
topping up at the fi lling point (Fig. 2/H) must be
repeated until all the oil pipes have been fi lled
completely. The fi lling point must not be open
when the pump is running.

6.2

Decommissioning/

storing

Stop the machine

a) Switch the machine off.

b) If available close the cut off device in the suction

and pressure pipe.

c) Disconnect the machine from the electricity

source.

d) Depressurise the machine: Open the pipes

slowly

.

The pressure reduces slowly.

e) Remove the pipes and hoses.

f) Seal the connections for suction and discharge

nozzles with adhesive foil.

see also Section 3.2.1, Page 11

6.3

Re-commissioning

a) Check the condition of the machine (cleanliness,

cabling etc.).

b) Drain the preserving agents.

For installation see Section 5 Page 14

For commissioning see Section 6.1 Page 17

Advertising