030-834-J0 Rev A

Page

23 of 34

5.7.4

Breaker Hot Connections

Connect to the four load breaker hot (–) termination pairs using 1/4" on 5/8" center lugs (Figure 11).

Figure 11–Front view of distribution module (cover removed)

GMT Fuse Distribution

CAUTION: Total current maximum is 30A.
The ten (10) GMT-style fuses and the associated control terminal blocks are accessible from the front panel

of the distribution module (Figure 11).
Connect via screw terminations, hot (–) and return (+), for each fuse position.

5.8

DC Output for Model 030-835-20/ 030-845-20 (bulk distribution)

Models 030-835-20 and 030-845-20 have no integrated distribution. Output connections are made using

1/4" on 5/8" center 2-hole lugs that connect to the main output bars similar to the 030-851-20 battery

terminations.

5.9

CAN Ports

The 3 and 4-module shelf, 1 RU model with CXCM1, has a single CAN port for communications with CAN-

enabled equipment (nodes). It is located on the side of the shelf. The 5-module shelf has two ports, one on

each side. The 2RU shelf has two ports on the side.
Daisy-chain from node to node (CAN OUT of one node to CAN IN of another) as necessary and ensure

that only the last node is terminated.

4-module shelf – termination IN – default

5-module shelf – termination OUT – default

NOTE: This system has a limit of twelve Cordex 1.2kW rectifiers; they do not have self-powered CAN Bus nodes.

5.10

Network Connection and Remote Communications via CXCM1

The Cordex system can be set up, monitored and tested via modem or ETHERNET 10/100 Base-T serial

data connection. The communication protocol supports a web interface. Some standard scenarios are

described in the following sections.